PCB & PCBA Frequently Asked Questions
A centralized engineering knowledge base addressing common questions across PCB manufacturing, PCBA assembly, materials, processes, and reliability-driven design decisions.
FAQ
PRODUCTS CENTER
Get Custom Quote
PRODUCTS CENTER
PCBA Basics & Overview
What is the cost structure for low-volume PCBA?
Material cost 40-50%, processing (incl. depreciation) 30-40%, inspection 10-20%. Unit cost 30-50% higher than mass production
What is the ESD damage threshold for components?
CMOS devices have HBM sensitivity<2000V. Production environments must maintain<100V static voltage with wrist straps and ionizers.
What is the allowable range for PCB warpage?
IPC-A-600: ≤1.5%; BGA-assembled PCBs ≤0.7% to prevent dry joints.
How to evaluate solder joint mechanical strength?
0603 joints: minimum pull force ≥1.5N; QFP leads: shear force ≥5N, per IPC-9701.
What are the moisture absorption limits for PCBs under different conditions?
IPC-J-STD-033: MSL level 3 components ≤168 hours at 30℃/60%RH; bake at 125℃ for 4-8 hours if exceeded.
What is the open-circuit detection sensitivity of ICT?
High-precision ICT detects opens below 0.1Ω, with bed-of-nails contact resistance<100mΩ.
What is the minimum resolution of X-Ray inspection?
Micro-focus X-Ray achieves 5μm resolution, detecting 0.3mm pitch BGA joints and 20-layer PCB interiors.
What is the defect coverage rate of AOI inspection?
High-speed AOI covers ≥95% of 0402 component defects, >98% for QFP bridging/missing leads, but struggles with BGA internal voids.
What is the standard for ionic residue after cleaning?
IPC-TM-650: Ionic residue<1.5μg/cm² NaCl equivalent, surface insulation resistance>10⁹Ω.
What are the pros and cons of aqueous vs. solvent cleaning?
Aqueous: eco-friendly but requires high temperature (60-80℃), risk of corrosion; Solvent (e.g., NMP): efficient but needs explosion-proof equipment, VOC restrictions.
What temperature and airspeed settings for QFP rework with hot air guns?
Preheat 150-180℃, rework temperature 320-350℃, airspeed 4-6 (20-30L/min) to avoid lead deformation.
How to align and reball BGAs during rework?
Optical alignment systems (±25μm accuracy) with reballing fixtures ensure<0.1mm deviation between solder balls and pads.
Get Custom Quote
PRODUCTS CENTER


